Windy in spring season, is particularly important for the installation and fixation, especially these days the wind of Dezhou particularly large, walk in the street with a blow away feeling, not to mention the relevant personnel in the air operations
basket and basket safety, so for a fixed above problem must not be careless, it would have responsibility for our operator and a serious and responsible attitude.
Electric basket, basket top top step pedal vertical rod as the overlap extension, the overlapping length shall not be less than 1000mm, and the use of less than 2 rotating fastener fixed, the fastening end edge of the cover plate to the rod end distance is not less than 10mm.
The master node must be set at a horizontal pole, with a right angle fastener is buckled and non removal. The main node of the two right angle fastener center distance shall be not more than 150mm. In the double scaffolding, rely on the lateral wall at one end of the rod extended length should not be more than 500mm.